Garden Work Continued

Introducing Part two of this long process I decided to take on, I'm going to post some video of the work getting completed, Basically this stage is lowering/grading the property so its a usable space, I have two parts which is upper and lower sections with a slope going down to the lower which is by the stream, I will be building a retaining wall on the upper half,

During the two day job, I had three trucks of dirt to the site added to the lower section, and had the upper section worked on twice.

Lower Sections grading

This part we added three trucks of dirt to help raise it a little and get it as level as much as possible

Showing the upper section being graded and completed will grass seed and hay placed on top to help the seed stay in place

There will be a third part to this, showing a fence going in and also a retaining wall going up.